Welcome to the Quality Gate for the Altamont Wall Small!
Start
 
What is this fixture's name?


 
What is this Altamont's Job Number? *

XXXXX-XX
 
What is this Altamont's Serial Number? *

XXXX-XXXX
 
Who is performing this inspection? *












 
Who performed the work? *











 
What Quality Gate are you inspecting? *


 
Is the job cut out of the correct material for the required finish? (Use finish chart and pick one below)


 
Do you have all loose parts/hardware required to move to the next step?

Count the parts and then answers questions below:
 
How many CAP-BR-10-482 do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CHK-TAP-7/8 do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many FST-8-32x3/4-FHSL-BMS do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many FST-10-32x1/2-FHSL-BMS do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many NIP-2-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-1/2-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-1 1/4-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CNDL-SLV-7/8x3-NO-NCH do you have? *

 
Incorrect. You should have 1 of these parts.

 
(m) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(m) Choose one INT code for issue found at this Quality Gate:


 
(m) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Mat'l Mgt Quality Gate!

 
Are the rings secure and flush with the vertical plates? *

     
 
Is the cage square and level after removing it from the jig? *

     
 
Do the solder seams meet the UECo standards? *

(i.e. are the corner seams on the legs in good standing and excess solder removed)
     
 
(c) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(c) Choose one INT code for issue found at this Quality Gate:


 
(c) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Craft Quality Gate!

 
Is the fixture free of excessive solder, visible solder holes, and still meet UECo standards for solder seams? *

     
 
Is the fixture free of flux, 80 grit marks, break marks, and thread marks? *

     
 
Is the fixture free of scratches and dents? *

     
 
Do you have all loose parts/hardware required to move to the next step?

Count the parts and then answers questions below:
 
How many CAP-BR-10-482 do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CHK-TAP-7/8 do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many FST-8-32x3/4-FHSL-BMS do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many FST-10-32x1/2-FHSL-BMS do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many NIP-2-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-1/2-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-1 1/4-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CNDL-SLV-7/8x3-NO-NCH do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CPL-PLN-10-219 do you have? *

 
Incorrect. You should have 1 of these parts.

 
(s) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(s) Choose one INT code for issue found at this Quality Gate:


 
Choose one or more INT codes for issues found at this Quality Gate:


 
(s) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Surface Prep Quality Gate!

 
Does the fixture finish match the work order? *

     
 
Is the finish consistent throughout the entire fixture? *

     
 
Is the finish free of any visible defects in the finish (i.e. scratches, spots, inconsistent coverage)? *

     
 
Do you have all loose parts/hardware required to move to the next step?

Count the parts and then answers questions below:
 
How many CAP-BR-10-482 do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CHK-TAP-7/8 do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many FST-8-32x3/4-FHSL-BMS do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many FST-10-32x1/2-FHSL-BMS do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many NIP-2-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-1/2-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-1 1/4-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CNDL-SLV-7/8x4-NO-NCH do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CPL-PLN-10-219 do you have? *

 
Incorrect. You should have 1 of these parts.

 
(f) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(f) Choose one INT code for issue found at this Quality Gate:


 
Choose one or more INT codes for issues found at this Quality Gate:


 
(f) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Finishing Quality Gate!

 
Is the fixture and hardware free of any finish defects? *

     
 
Was the glass cut properly and does it fit securely? *

     
 
Has the ground screw been added to the crossbar that is attached to back of the fixture? *

     
 
Did the fixture pass all Hi-Pot, Ground Continuity, and light bulb testing? *

     
 
Are all loose parts/hardware packed with the fixture?

 
(1) 25W T6 Bulb *

     
 
(2) Blue Wire Nuts *

     
 
Was the fixture and glass packed per the Final Work Instructions? *

     
 
Was the fixture cold formed when Packed?

     
 
* Is the candle sleeve straight?

     
 
(g) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(g) Choose one INT code for issue found at this Quality Gate:


 
(g) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the GWP Quality Gate!

Thank you, {{answer_9330173}}!
again
Thank you, {{answer_9330173}}!
again