Welcome to the Quality Gate for the Altamont Regular!
Start
 
What is this fixture's name?


 
What is this Altamont's Job Number? *

XXXXX-XX
 
What is this Altamont's Serial Number? *

XXXX-XXXX
 
Who is performing this inspection? *















 
Who performed the work? *












 
What Quality Gate are you inspecting? *


 
(m) Did this fixture pass this Quality Gate the first time?

     
 
(m) Choose one INT code for issue found at this Quality Gate:


 
(m) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Matl Mgt Quality Gate!

 
Are the rings secure and flush with the vertical plates? *

     
 
Is the cage square and level after removing it from the jig? *

     
 
Do the solder seams meet the UECo standards? *

(i.e. are the corner seams on the legs in good standing and excess solder removed)
     
 
Do you have all loose parts/hardware required to move to the next step?

     
 
(c) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(c) Choose one INT code for issue found at this Quality Gate:


 
(c) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Craft Quality Gate!

 
Is the fixture free of excessive solder, visible solder holes, and still meet UECo standards for solder seams? *

     
 
Is the fixture free of scratches and dents? *

     
 
Is the fixture free of flux, 80 grit marks, break marks, and thread marks? *

     
 
Are the glass channels straight after sandblasting? (non-polished fixtures only)

     
 
Is the fixture free of waterjet marks?

     
 
Are there any round edges noticed (e.g. no round edges on diving board)?

     
 
Is the fixture free of excess solder (especially in corners/edges)?

     
 
Have you properly prepared the fixture for Finishing team?

Polished – fixture should be left disassembled          
Ox – fixture should be assembled
Paint – fixture should be partial assembled
     
 
(s) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(s) Choose one INT code for issue found at this Quality Gate:


 
(s) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Surface Prep Quality Gate!

 
Does the fixture finish match the work order? *

     
 
Is the finish consistent throughout the entire fixture? *

     
 
Is the finish free of any visible defects in the finish (i.e. scratches, spots, inconsistent coverage)? *

     
 
Do you have all loose parts/hardware required to move to the next step?

Count the parts and then answers questions below:
 
How many CAP-BR-10-482 do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CHK-TAP-7/8 do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many FST-8-32x3/4-FHSL-BMS do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many FST-10-32x1/2-FHSL-BMS do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many NIP-2-1/8P do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many NIP-3/4-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CNDL-SLV-7/8x4-NO-NCH do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CPL-PLN-10-126 do you have? *

 
Incorrect. You should have 1 of these parts.

 
(f) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(f) Choose one INT code for issue found at this Quality Gate:


 
(f) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Finishing Quality Gate!

 
Is the fixture and hardware free of any finish defects? *

     
 
Was the glass cut properly and does it fit securely? *

     
 
Has the ground screw been added to the crossbar that is attached to back of the fixture? *

     
 
Did the fixture pass all Hi-Pot, Ground Continuity, and light bulb testing? *

     
 
Are all loose parts/hardware packed with the fixture?

 
(1) 25W T6 Bulb *

     
 
(2) Blue Wire Nuts *

     
 
Was the fixture and glass packed per the Final Work Instructions? *

     
 
Was the fixture cold formed when Packed?

     
 
* Is the candle sleeve straight?

     
 
(g) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(g) Choose one INT code for issue found at this Quality Gate:


 
(g) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the GWP Quality Gate!

Thank you, {{answer_9327665}}!
again
Thank you, {{answer_9327665}}!
again