Welcome to the Quality Gate for the Metro!
start
 
What is the fixture name?


 
What is the Job Number? *

XXXXX-XX
 
What is this Metro's Serial Number?

Format: XXXX-XXXX (Fab can skip this question)
 
Who is performing this inspection? *












 
Who performed the work? *












 
What Quality Gate are you inspecting? *


 
Who is performing the inspection?







 
Is the job cut out of the correct material for the required finish? (Use finish chart)

     
 
Incorrect material. Please do not proceed until you have the correct finish for work order.

 
How many fixtures are in this order? *

 
Do you have ({{answer_9286871}} x 1) of the UE-9400WR-P1? *

     
 
Incorrect amount. Please do not proceed until you have the exact amount of parts requested on work order.

 
Do you have ({{answer_9286871}} x 2) of the UE-9400WR-P2? *

     
 
Incorrect amount. Please do not proceed until you have the exact amount of parts requested on work order.

 
Do you have ({{answer_9286871}} x 1) of the UE-9400WR-P4? *

     
 
Incorrect amount. Please do not proceed until you have the exact amount of parts requested on work order.

 
Do you have ({{answer_9286871}} x 1) of UE-9400WR-P5?

     
 
Incorrect amount. Please do not proceed until you have the exact amount of parts requested on work order.

 
Do you have ({{answer_9286871}} x 1) of UE-9400R-P6?

     
 
Incorrect amount. Please do not proceed until you have the exact amount of parts requested on work order.

 
Do you have ({{answer_9286871}} x 1) of UE-9400WR-P8?

     
 
Incorrect amount. Please do not proceed until you have the exact amount of parts requested on work order.

 
Do you have ({{answer_9286871}} x 2) of UE-9400WR-P9?

     
 
Incorrect amount. Please do not proceed until you have the exact amount of parts requested on work order.

 
Is this fixture square on all sides and corners? *

     
 
Is the arm correctly positioned and perpendicular to the backplate? *

     
 
Do the solder seams meet the UECo standards? *

     
 
Do you have all loose parts/hardware required to move to the next step?

Count the parts and then answers questions below:
 
How many CAP-BR-B345 do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CHK-TAP-1/2 do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many FST-1/4-20x12-BHS do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many NIP-3/4-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-2-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-HEX-5/16-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NUT-1/4x20-ACORN do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many NUT-LK-10-909 do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CPL-PLN-10-126 do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many PRT-SPIN-METRO-BR do you have? *

 
Incorrect. You should have 1 of these parts.

 
(c) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(c) Choose one INT code for issue found at this Quality Gate:


 
(c) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Craft Quality Gate!

 
Who performed the work? *








 
Who is performing this inspection? *









 
Is the fixture free of scratches and dents? *

     
 
Is the fixture free of excessive solder, visible solder holes, and still meet UECo standards for solder seams? *

     
 
Do you have all loose parts/hardware required to move to the next step?

Count the parts and then answers questions below:
 
How many CAP-BR-B345 do you have? *

 
How many CHK-TAP-1/2 do you have? *

 
Incorrect. You should have 1 of these parts.

 
Incorrect. You should have 1 of these parts.

 
How many FST-1/4-20x12-BHS do you have? *

 
How many NIP-3/4-1/8P do you have? *

 
Incorrect. You should have 2 of these parts.

 
Incorrect. You should have 1 of these parts.

 
How many NIP-2-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-HEX-5/16-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NUT-1/4x20-ACORN do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many NUT-LK-10-909 do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many CPL-PLN-10-126 do you have? *

 
Incorrect. You should have 1 of these parts.

 
(s) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(s) Choose one INT code for issue found at this Quality Gate:


 
(s) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Surface Prep Quality Gate!

 
Who is performing this inspection? *









 
Who performed the work? *









 
Is the finish free of any visible defects in the finish (i.e. scratches, spots, inconsistent coverage)? *

     
 
Does the fixture finish match the work order? *

     
 
Do you have all loose parts/hardware required to move to the next step?

Count the parts and then answers questions below:
 
How many CAP-BR-B345 do you have? *

 
How many CHK-TAP-1/2 do you have? *

 
Incorrect. You should have 1 of these parts.

 
Incorrect. You should have 1 of these parts.

 
How many FST-1/4-20x12-BHS do you have? *

 
How many NIP-3/4-1/8P do you have? *

 
Incorrect. You should have 2 of these parts.

 
Incorrect. You should have 1 of these parts.

 
How many NIP-2-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-HEX-5/16-1/8P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-1/4x20-ACORN do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many NUT-LK-10-909 do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CPL-PLN-10-126 do you have? *

 
Incorrect. You should have 1 of these parts.

 
(f) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(f) Choose one INT code for issue found at this Quality Gate:


 
(f) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Finishing Quality Gate!

 
Who is performing this inspection? *









 
Who performed the work? *








 
Is the fixture and hardware free of any finish defects? *

     
 
Has the ground screw been added to the crossbar that is attached to back of the fixture? *

     
 
Did the fixture pass all Hi-Pot, Ground Continuity, and light bulb testing? *

     
 
Are all loose parts/hardware packed with the fixture?

 
(1) 40W Flood Reflector Bulb *

     
 
(2) Blue Wire Nuts *

     
 
Was the fixture packed per the Final Work Instructions? *

     
 
Was the fixture cold formed when Packed?

     
 
* Do you have the correct shade color?

     
 
* Was the shade packed in a 6 x 6 x 6 box?

     
 
(g) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(g) Choose one INT code for issue found at this Quality Gate:


 
(g) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the GWP Quality Gate!