Welcome to the Quality Gate for the Factory Small!
Start
 
What is this fixture's name?


 
What is the Job Number? *

XXXXX-XX
 
What is the Serial Number? *

XXXX-XXXX
 
Which material below matches the finish chart for {{undefined}} and is it correct on this order?


 
Who is performing this inspection? *














 
Who performed the work? *








 
What Quality Gate are you inspecting? *


 
Do you have all loose parts/hardware required to move to the next step?

Count the parts and then answers questions below:
 
How many NIP- .75 - .25P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many CHK-TAP-1-1/2 do you have? *

 
Incorrect. You should have 3 of these parts.

 
How many CNDL-SLV-1-1/2-NO-NCH do you have? *

 
Incorrect. You should have 3 of these parts.

 
How many NIP-.5-.125P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NIP-.75-.125P do you have? *

 
Incorrect. You should have 4 of these parts.

 
How many NIP-2-.25P do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NUT-LOCKWASH-B1230 do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NUT-LOCKWASH-B1230 do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many MNT-CRSBAR-1-4F do you have? *

 
Incorrect. You should have 1 of these parts.

 
How many NUT-LK-B18  do you have? *

 
Incorrect. You should have 2 of these parts.

 
How many BLB-MB-40WRFLFLD do you have? *

 
Incorrect. You should have 3 of these parts.

 
(m) Did this fixture pass this Quality Gate the first time?

     
 
(m) Choose one INT code for issue found at this Quality Gate:


 
(m) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Matl. Mgt. Quality Gate!

 
Is the fixture geometrically correct? *

(i.e. square, triangular, circular)
     
 
Did you verify overall height? *

(i.e. square, triangular, circular)
     
 
Do the solder seams meet the UECo standards? *

     
 
Do you have all loose parts/hardware required to move to the next step?

     
 
(c) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(c) Choose one INT code for issue found at this Quality Gate:


 
(c) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Craft Quality Gate!

 
Is the fixture free of excessive solder, visible solder holes, and still meet UECo standards for solder seams? *

     
 
Is the fixture free of flux, 80 grit marks, break marks, and thread marks? *

     
 
Is the fixture free of scratches and dents? *

     
 
(s) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(s) Choose one INT code for issue found at this Quality Gate:


 
(s) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Surface Prep Quality Gate!

 
Does the fixture finish match the work order? *

     
 
Is the finish consistent throughout the entire fixture? *

     
 
Is the finish free of any visible defects in the finish (i.e. scratches, spots, inconsistent coverage)? *

     
 
(f) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(f) Choose one INT code for issue found at this Quality Gate:


 
(f) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the Finishing Quality Gate!

 
Is the fixture and hardware free of any finish defects? *

     
 
Was the glass cut properly and does it fit securely? *

     
 
* Was the mounting plate installed to the back of the fixture?

     
 
Has the ground screw been added to the mounting plate or crossbar? *

     
 
Are all loose parts/hardware packed with the fixture?

 
(3)BLB-MB-40WRFLFLD *

     
 
* (1) FST-HEX-WRENCH3

     
 
Was the fixture and glass packed per the Final Work Instructions? *

     
 
Was the fixture cold formed when Packed?

     
 
(g) Did this fixture pass this Quality Gate the first time with no rework, touch up, etc.?

     
 
(g) Choose one INT code for issue found at this Quality Gate:


 
(g) Add any notes or detailed descriptions of the non-conformance(s):

 
Congratulations on completing the GWP Quality Gate!

Thank you, {{answer_9331494}}!
again
Thank you, {{answer_9331494}}!
again